Tractel

Suspended access and rooftop anchorage

Roof Anchors and Davit Systems for Suspended Access

Tell us the building and how crews get over the edge. We will identify the right anchor or davit configuration, what it has to be rated for, and what certification you need to pass inspection.

  • Tieback anchors, roof davits, peak anchors and permanent anchorage
  • New installations, retrofits, and inspection of existing anchors
  • Specified to OSHA, Cal OSHA, ASME ANSI and CAN CSA requirements
Permanent rooftop anchor with a steel lifeline attached, on a high-rise roof with glass towers behind.

What we send back

A Configuration, Not a Catalog

Anchor or Davit Specification

The configuration your building and access method require, with load ratings.

Placement and Quantity

How many anchors, where they go, and how they tie into the structure below.

Certification Path

What testing and documentation you need so the system passes inspection.

If your existing anchors just need inspection rather than replacement, we will say so.

Solutions

Anchorage for Every Access Method

Permanent tieback anchor on a commercial rooftop.

Tieback Anchors

Permanent anchorage for rope descent and window washing. The point a worker ties off to while suspended.

Blue Tractel davit arm with an aluminum boom and rope pulley, mounted on its mast.

Roof Davits and Davit Arms

Fixed and powered davit systems that carry a suspended platform or bosun chair over the roof edge.

Peak anchor installed on a pitched roof ridge.

Peak and Pitched-Roof Anchors

Reusable and permanent anchors for sloped roofs where there is no flat surface to work from.

Worker in a harness lowered into a manhole on a blue Tractel davit and winch while a second worker operates it.

Confined Space Davits

Davit and winch combinations for vertical entry and retrieval at manholes, tanks and vaults.

Why people call us

Three Reasons This Usually Becomes Urgent

  • A window cleaning or restoration contractor refused to work because the anchors could not be documented.
  • An inspection or audit flagged the rooftop anchorage and there is a deadline attached.
  • A new building is being designed and the anchorage has to be engineered in before the roof goes on.

All three are easier to solve before the deadline than after.

Who We Work With

  • Commercial Real Estate and Property Management
  • Building Restoration
  • Window Cleaning Contractors
  • Facility Management
  • Architects and Engineers
  • Water and Wastewater
  • Oil and Gas

Step one

Tell Us About the Building

Building type, how crews access the facade or roof, and whether there is existing anchorage. Two minutes.

We use your information only to respond to this request. See our privacy policy.

Before you ask

Questions We Get Every Week

Send Us the Building

We will tell you what anchorage it needs and what it takes to document it.